Molds complete

The 7 molds are now completed with all the required marks on them. The transom has been splined and glued up an ready to be planed flat. The inner and outer stem pieces are squared up and need the bevels roughed in. I tried to laminate the knees but even at 3/16 thickness they broke.   I think I will go with sawn knees in oak or mahogany.

Frames complete

Frames complete

Jig for bending knees

Jig for bending knees

Glued up transom ready for flattening

Glued up transom ready for flattening

Glueing and clamping setup for transom

Glueing and clamping setup for transom

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>